[GiDlist] Incremental result between two timesteps
Posted: Wed Aug 11, 2010 10:14 am
Hi all,
is there a way, starting from two result files obtained at different
solution increments and the same mesh, to get an incremental result, as the
difference between the two? For instance new_diplacement =
displacement(t=15) - displacement(t=10).
Thanks for your help,
N.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://listas.cimne.upc.edu/pipermail/gidlist/attachments/20100811/d55186cd/attachment.htm
is there a way, starting from two result files obtained at different
solution increments and the same mesh, to get an incremental result, as the
difference between the two? For instance new_diplacement =
displacement(t=15) - displacement(t=10).
Thanks for your help,
N.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://listas.cimne.upc.edu/pipermail/gidlist/attachments/20100811/d55186cd/attachment.htm